Plastic Formwork

Plastic Formwork
Product Introduction:
The plastic formwork system consists of plastic panels, installation handles, alignment crossbars (also known as reinforced back ribs), and support pillars. Even unskilled workers can quickly and effectively install walls, columns, and slabs. The plastic panel is made of high-performance ABS (Acrylonitrile Butadiene Styrene) plastic material or polypropylene plastic material, which is a thermoplastic polymer material with high strength, good toughness, and easy processing and molding.
Send Inquiry
Description
Technical Parameters

Introduction

 

The plastic formwork system consists of plastic panels, installation handles, alignment crossbars (also known as reinforced back ribs), and support pillars. Even unskilled workers can quickly and effectively install walls, columns, and slabs. The plastic panel is made of high-performance ABS (Acrylonitrile Butadiene Styrene) plastic material or polypropylene plastic material, which is a thermoplastic polymer material with high strength, good toughness, and easy processing and molding.

 

Product advantages

Modular Plastic Formwork 106
01

Easy installation

  • Lightweight: The plastic panel has a maximum size of 1.2 × 0.6m and weighs only about 10KG, making it easy to install without the need for any mechanical tools.
  • Modular design: The modular design of plastic panels allows inexperienced workers to easily assemble them
  • Cleaning the surface of the plastic panel is simpler: due to the special ABS material, the surface of the plastic panel will not adhere to the concrete after each concrete pouring is completed. Simply clean the surface of the plastic panel with clean water and it can be reused
02

High quality concrete forming

  • The plastic panel is made of ABS material and injected into the mold for molding. The product has high dimensional accuracy, which makes the dimensional accuracy of the concrete structure higher
  • The surface of the plastic panel is smooth and flawless, making the concrete surface smooth and flawless
  • The plastic panel is connected with auxiliary materials such as standard sized installation handles, tie-rod, nuts, and plastic sleeves, and automatically leveled to make the concrete surface smoother
Modular Plastic Formwork 107
Modular Plastic Formwork 196
03

High economic value

  • Due to the good durability of ABS plastic material, the plastic panel can be reused 80-100 times
  • Due to the good quality of concrete pouring, the related expenses of secondary plastering can be avoided, saving costs)
  • Plastic products have high recycling and reuse value

Products Description

 

Item

Features

Materials

ABS(Acrylonitrile Butadiene Styrene)

Density

1.03g/cm³-1.28g/cm³

Weight

14kg/sqm

Max Size

1.2*0.6m

Max Casting Slab Thickness

300mm

Maximum Load Pressure 

60KN/sqm for wall & 80KN/sqm for column

Operation Temp. 

-20℃to +80℃

Surface Hardness 

94

 

Specifications

Name

Size(Length*Width*Height mm)

Color

Weight(KG)

Material

Panel

1200*600*75 mm

Black

10.1

ABS(Acrylonitrile Butadiene Styrene)

400*600*75 mm

3.7

350*600*75 mm

3.4

300*600*75 mm

2.7

250*600*75 mm

2.5

200*600*75 mm

2.2

180*600*75 mm

2.1

300*300*75 mm

1.4

300*250*75 mm

1.3

300*200*75 mm

1.25

300*150*75 mm

0.7

250*250*75 mm

1.13

250*200*75 mm

0.9

200*200*75 mm

0.8

200*150*75 mm

0.6

Outside Corner Panel

250*600*75 mm

2.85

Internal Corner Panel

250*100*600*75 mm

3.5

Top Angle Panel

250*250*100*75 mm

1.5

Handle

-

White

0.1

PA(Polyamides)

 

Application Scope

 

Be applied in building concrete structures of mall and medium-sized residential and commercial buildings.

Basements, columns, modular houses, various wall concrete structures, etc. are particularly suitable for projects that require anti-corrosion.

 

Components

 

Item

Production Picture

Item

Production Picture

Plastic Panels

image001

PVC Sleeve

image009

Plastic Handle

image003

Adjustable Column Clamp

image011

Tie Rod&Wing Nut

image005

Panel fixing bracket

image013

Steel Prop

image007

   

 

WKS(Work-sun)Competitive Advantages

 

  • Experienced engineering team with an average working experience of no less than 10 years
  • Over 20 years of production experience, stable product quality
  • Our factory is located in a cluster area of the industrial chain and has a significant cost advantage

 

WKS(Work-sun)service

 

  • Customized production services to assist you in completing customized product configurations based on the architectural and structural drawings of the project
  • A professional team of engineers and consultants will provide you with detailed product application solutions to ensure the smooth implementation process of the product
  • Timely response to service, professional engineers are available before, during, and after sales to promptly solve and meet your needs
  • Our professional engineering team will provide you with more reasonable suggestions for your engineering application plan during the service process, and meet your satisfaction according to the final confirmed needs.
  • Worry free after-sales service, one-on-one service team to help you complete the implementation and landing of engineering projects
  • We will establish independent service teams for each project to ensure that product production matches demand perfectly, and that products are delivered to the construction site to achieve efficient construction.

 

FAQ

Q: a. Are you a trading company or a manufacturer?

A:  Firstly, we are a subsidiary foreign trade company of a group company, mainly responsible for operating the export business of formwork and scaffolding products for the group company.
 Secondly, our group company has two major production bases, specializing in the production and processing of formwork and scaffolding products for over 20 years.

Q: b. How can I get a quotation?

A:  If you are a simple concrete pouring project, such as walls, swimming pools, main structures, and basements, and you have your own engineer, you can directly provide us with a bill of materials, and we will provide you with a quotation according to the bill of materials.
 If you are a concrete pouring project for apartments, residences, villas, etc., and need to use plastic formwork products as a whole, our professional consultants will communicate with you in detail. After you provide us with the engineering architectural drawings and structural drawings, our engineers will develop an application plan for you and provide you with a quotation based on the specific plan.

Q: c. How long does it usually take to complete the plan and quotation after we provide the engineering architectural drawings and structural drawings?

A:  Generally, it takes about 5-8 days to complete the specific plan and detailed quotation

Q: d. Can you provide free samples?

A:  Yes, we can provide samples. You will need to pay for the shipping cost.

Q: e. How long is the estimated delivery time after the contract is signed?

A:  According to the complexity of the project, it usually takes 30-60 days to complete the stocking. We will estimate a more accurate delivery time for you during the planning and quotation process.

Q: f. Is the plastic template prone to deformation?

A:  If the construction environment where the project is located belongs to long-term high temperature, the increase in temperature of the concrete pouring project may cause slight deformation of the formwork. It is recommended to use all aluminum alloy formwork or steel frame wood formwork system in high temperature areas.

Q: g. What are the defects of the plastic template system?

A:  The load force is too small to complete the construction of large-sized concrete structures; Poor high temperature resistance, slight deformation may occur when used in high-temperature areas.

Q: h. What is the payment method you require?

A:  Payment<=1, 000USD, 100% in advance.
 Payment>=10, 000USD, 30% T/T in advance ,balance before shipment.
 Or L/C

 

Send Inquiry