Aluminum Formwork

Aluminum Formwork
Product Introduction:
Introduction Aluminium formwork system is a construction system for forming cast in place concrete structure of a Building. Aluminium formwork is made in aluminum alloy profile what is the main material and is made into formwork through machining, welding, and other processes, which is suitable...
Send Inquiry
Description
Technical Parameters

Introduction

 

  • Aluminium formwork system is a construction system for forming cast in place concrete structure of a Building. Aluminium formwork is made in aluminum alloy profile what is the main material and is made into formwork through machining, welding, and other processes, which is suitable for concrete engineering.
  • Aluminium formwork system can be assembled flexibly according to different structural sizes. The design and application of aluminum alloy formwork is an innovation in formwork technology.
  • Aluminum alloy formwork system increases efficiency, and also produces an extraordinarily strong structure with excellent concrete finish.

 

Advantage

a.Flexible and efficient assembly

More than 85% of standard formwork and each formwork has an installation code.

Aluminum alloy formwork assembly method is simple and easy to operate.

Due to the formwork is light weight, workers can easily carry and assemble it.

Aluminum Formwork System 2
Aluminum Formwork System 4

b.Good quality of concrete forming

High strength and precision, with few joints on the aluminum alloy formwork surface. 

Customized production of aluminum alloy formwork with higher dimensional accuracy. 

Complete the entire structure with one-time pouring

c.Environment friendly and economical

Great recyclable value, over 35% higher than steel, beneficial for environmental development

Reduce construction waste on construction sites by nearly 30%

Longer service life, can be reused up to 200-300 times, can reduce costs by about 25%

Due to high construction efficiency, it can reduce labor costs by about 20%

Reduce expenses for renting equipment such as cranes, wall plastering, and decoration costs

Aluminum Formwork System 7
Aluminum Formwork System 1811

d.More safer construction environment

After assembly, it forms a whole with high stability. 

No need to work with a crane, greatly reducing the risk of falling objects from high altitude.

High bearing capacity, and is not easily deformed

 

Specifications& Features

Aluminum Alloy Features

Shear-strength(Fva)

115N

Poisson's ratio(Va)

0.3

Yield strength(Fa)

200N

Elasticity modulus(Ea)

70KN

Composition

Inner&Outer wall panel and corner panel

Beam bottom&side panel and corner panel

Slab panel&prop head and corner panel

Staircase panel

Alloy Material

6061-T6

Material Type

Complete extrusion

Main Welding Type 

Friction Stir Welding

Thickness of Panel

4mm

Thickness of Edge Frame

8mm

Height of Edge Frame

65mm or customization

Standard of Wall Panel Width

50mm-600mm

Standard of Wall Panel Height

2400mm-2600mm or customization

Standard of Slab Panel Size

400mm-600mm*1200mm or customization

Weight of Panel

24KG/㎡

Standard Prop Adjustable Range

1800mm-3300mm or customization

 

Components

 

WALL&COLUMN -Wall Panel

WALL&COLUMN-Wall End Panel WALL&COLUMN-Wall Top Panel

product-800-600

product-800-600 product-640-480

DESCRIPTION:Wall Panel is used to support vertical structure like wall and column. Usually the bottom part is linked to Rockers with Bolt &Nut for easy dismantling while the top is connected to Beam Joint for beam or Slab Joint with Pin &Wedge.

DESCRIPTION:Fill up the formwork area, where standard wall panels unable to fit at the horizontal-end sides of the formwork system. DESCRIPTION:Wall top panel is used to connect the standard wall panel to satisfy the storey.

WALL&COLUMN-External Corner Joint

WALL&COLUMN-Internal Corner Joint WALL&COLUMN-Rocker

product-800-600

product-800-600 product-314-236

DESCRIPTION:Used to connect wall panels at external corner area.

DESCRIPTION:Internal corner joint is used to connect wall panel and wall end panel at internal corner.The height of IC are equal to the wall panel height. DESCRIPTION: Used to connect wall panels at external corner area.

WALL&COLUMN-K Panel

BEAM-Beam Soffit Panel

 BEAM-Beam Soffit Panel

product-620-465

product-450-338 product-714-536

DESCRIPTION: K Panel are fixed on the external wall panels with K Panel screws before concrete pouring. The function of K Panel is to support the external wall panels for next floor.

DESCRIPTION: Beam soffit Panel issued to support Beam. DESCRIPTION:Beam soffit Panel issued to support Beam.

BEAM-Beam Prop Head

BEAM-Beam Prop Head BEAM-Beam Corner Joint

product-320-240

product-430-322

product-480-360

DESCRIPTION:Panel to support beam and use to join two Beam Bottom with Pin &Wedge.

DESCRIPTION: Use to join the beams together (Middle beam and/or End beam),the steel props will be placed under the prop head. DESCRIPTION:Use for internal corners usually at Use for internal corners usually at Pin&Wedge.

BEAM-Beam Side Panel

BEAM-Beam Internal Corner BEAM-Beam Outer Corner

product-220-165

product-600-450

product-360-270

DESCRIPTION:Use for internal corners usually at beams.Connect to other panels using Pin&Wedge.

DESCRIPTION:Internal corner joint is used to connect panels at internal corner. The height of IC are equal to the beam side panel height. DESCRIPTION:Use for internal corners usually at beams.Connect to other panels using Pin&Wedge.

SLAB-Slab Panel

SLAB-Slab Middle Beam SLAB-Slab End Beam

product-545-410

product-590-442

product-370-278

DESCRIPTION:The slab panel will be used to support the concrete weight during concrete pouring and casting.

DESCRIPTION:Use to join the prop heads, the middle beam supports the slab panels. DESCRIPTION:Use to join the prop head and slab corner, the end beam supports the slab panels.

SLAB-Slab Corner Joint

SLAB-Slab In-corner Joint SLAB-Slab Prop Head

product-380-284

product-226-170

product-320-240

DESCRIPTION:The slab corner joint will be used to connect the wall panel and slab panel.

DESCRIPTION:The slab in-corner joint will be used to connect the wall panel and slab panel at the in-corner position. DESCRIPTION:Prop head to support the slab with steel Prop head to support the slab with steel&wedge and BB bar for middle beam&end beam.

 

 (Short Pin)

Item

(Wedge)

Item

image040

Weight:0.064kg

image042

Weight:0.03kg

Description:

The short pin&wedge will be used as a fastening device to make all panels link firmly.

Description:

The short pin&wedge will be used as a fastening device to make all panels link firmly.

Tie Rod

Item

Square Spacer&Hex Nut

Item

image044

Weight:1.5KG

image046-1

 

Weight:0.4KG

Description:

The tie rod will be used as a connecting device to link the wall panels firmly.

Description:

The square spacer&hex nut will be used as a fastening device to link tie rod and make wall panels firmly.

 Strengthen Back Edge

Item

PVC SLEEVE

Item

image050

Weight:7KG

image052

Weight:0.1kg

Description:

The strengthen back edge will be used as a fixed device to fix wall panels keeping a vertical position.

Description:

The pvc sleeve will be used as a fixed device to ensure the

structural size distance of the wall panels.

Long Pin

Item

Slab Transfer Box

Item

image054

Weight:0.19G

image056

Weight:10KG

Description:

The long pin will be used as a fastening device to make all panels link firmly.

Description:

The slab transfer box will be used as a mold to reserve a floor hole for transferring panels after dismantlement.

Adjusted Steel Prop

Item

Joint Bar

Item

image058

Weight:11.63-17.8KG

image060

Weight:0.68KG

Description:

The adjusted steel prop will be used as a load device to prop the slab panels.

Description:

The joint bar will be used as a connecting device to link the slab prop head and beam panels.

 Y Type Panel Puller

Item

 T Type Panel Puller

Item

image062

Weight:2KG

image064

Weight:10KG

Description:

The Y type panel puller will be used as a dismantling tools to remove the wall panels.

Description:

The T type panel puller will be used as a dismantling tools to remove the slab panels.

Hole Hook

Item

Working Bench

Item

image066

Weight:0.65KG

image068

Weight:11KG

Description:

The hole hook will be used as an adjuster tool to ensure smooth connections between panels.

Description:

The working bench will be used as the inner working platform.

Wall Panel Diagonal Prop

Item

Square Column Buckle

Item

image070

Weight:17KG

image071

Weight:18-51KG

Description:

The wall panel diagonal prop will be used as a supporting device to load of wall panels during concrete pouring. 

Description:

The square column buckle will be used as a fixed device to fasten the column panels with not tie rods firmly.

Kicker Nut

Item

Back Edge Connector

Item

image073

Weight:0.2KG

image075

Weight:3KG-6KG

Description:

The kicker nut will be used as a fixed device to fix the kicker panels.

Description:

The back edge connector will be used as a connecting device to link the strength back edge.

Flat Tie Item PVC sleeve Item

2

Weight:0.06KG

1

Weight:0.025KG

Description:

It is used to connect and fix both sides of aluminum formwork, bear the lateral pressure of concrete pouring, control wall thickness and prevent formwork bulging.

Description:

It is sleeved on flat wall tie to separate the tie from concrete, prevent adhesion and allow the wall tie to be reused after formwork removal.

Application Scope

 

Typical floors residential:

Relatively easy to apply aluminum alloy formwork system, with simple application, efficient construction and high quality.

Villa buildings:

More suitable for villa clusters with a larger quantity.

Apartments:

Relatively easy to apply aluminum alloy formwork system, with simple application, efficient construction and high quality.

Office Towers:

The relative difficulty is relatively high, and a more professional team like us is needed to provide you with project life-cycle services.

Hotels&Hospital&Schools:

The relative difficulty is relatively high, and a more professional team like us is needed to provide you with project life-cycle services.

Shopping Malls:

The relative difficulty is relatively high, and a more professional team like us is needed to provide you with project life-cycle services.

 

Assembly Instructions

 

Step 1

Step 2

Step 3

Step 4

Step 5

Mark the position of the structure

Assemble wall panels

Assemble Beam panels

Assemble slab panels

Assemble Kickers

image077 image079 image081-1 image083 image085

Engineers mark the structural line and mark the level of the floor slabs based on the approved construction drawings.

After the installation of wall re-bars and water&electricity pipes is completed, start assembling the wall panels,tie rods and reinforced steel square tube.

Assemble the beam panels according to the assembly drawing.

Assemble the slab panels and steel prop according to the assembly drawing.

Assemble the kickers according to the assembly drawing.

Step 6

Step 7

Step 8

Step 9

Step 10

Assemble staircase panels

Install water& electricity pipes and roof re-bars

Check and adjust the Panels to achieve structural dimension accuracy

Concrete pouring

Dismantling wall panels

image087 image089 image091 image093 image095

Assemble the staircase panels according to the assembly drawing.

Assemble the staircase panels according to the assembly drawing.

Check and adjust to ensure that the panels assembly conforms to the structural size and is stable and firm.

Concrete pouring is

distributed evenly throughout the wall section before begin to concrete the slab areas.

Use wall panel removal tools to dismantle wall panels in order, and violent dismantle is prohibited.

Step 11

Step 12

Step 13

Step 14

Step 15

Dismantling Beam panels

Dismantling slab panels

Dismantling Kickers

Dismantling tie rods&PVC pipes

Cleaning&Transfer panels

image097

image099

image101

image103

image105

Remove all pins and wedges from the section of beam side. Then, dismantle all the beam panels.

After remove all pins and wedges, middle beam and end beam will be easily removed. The prop head

and steel props must not be removed to support the floor slab.

The wall panels are removed to disconnecting the lower kicker from the adjacent templates and prepared

for reuse.

The tie rods are used to ensure the wall thickness and fixed the wall panels. PVC sleeves are used to protect the tie rods so as to reuse it. Both of it can be removed by special tools.

Transfer all templates

through slab box to next floor.

And all templates shall be cleaned after dismantle for a better quality in next floor.

 

Competitive Advantages

 

  • Having advanced production equipment and 20 years of production experience
  • A team of engineers with an average of about 10 years of experience ensures smooth progress of engineering projects
  • Our team has participated in over 2000 domestic aluminum alloy formwork application engineering projects
  • We can provide full cycle project services to ensure the smooth application of aluminum alloy formwork

 

One stop solution service process

 

  1. Free consultation service:You provide us with construction drawings to evaluate which formwork system solution is more cost-effective and provide a detailed quotation list for you
  2. Project emergency plan service:The project scheme formulation process will cautiously consider the emergency handling of aluminum alloy formwork system products during use
  3. Full process one-on-one project team service:Each project will have an independent team to provide you with professional engineering solution services, business communication services, and on-site construction management services

 

FAQ

Q: Are you a trading company or a manufacturer?

A: Firstly, we are a subsidiary foreign trade company of a group company, mainly responsible for operating the export business of formwork and scaffolding products for the group company.
Secondly, our group company has two major production bases, specializing in the production and processing of formwork and scaffolding products for over 32 years.

Q: What do you do?

A: Provide customers with professional implementation solutions, high-quality products, and efficient technical support services in the field of templates and scaffolding

Q: Do you provide samples ? Is the sample chargeable or free?

A: Yes, we can provide samples. You will need to pay for the shipping cost.

Q: What do you need in order to make a brief design and quotation when we have a construction project to be built? 

A: Architectural and structural drawings of the project

Q: How to get quotation?

A: If you are a simple concrete pouring project, such as walls, swimming pools, main structures, and basements, and you have your own engineer, you can directly provide us with a bill of materials, and we will provide you with a quotation according to the bill of materials. 
If you are a concrete pouring project for apartments, residences, villas, etc., and need to use plastic formwork products as a whole, our professional consultants will communicate with you in detail. After you provide us with the engineering architectural drawings and structural drawings, our engineers will develop an application plan for you and provide you with a quotation based on the specific plan. 

Q: How long does it take to make a brief design and quotation after we offer thestructural drawing? 

A: Generally, it takes about 5-8 days to complete the specific plan and detailed quotation

Q: How long is the estimated delivery time after the contract is signed?

A: According to the complexity of the project, it usually takes 30-60 days to complete the stocking. We will estimate a more accurate delivery time for you during the planning and quotation process.

Q: What is your terms of payment ?

A: T/T 30% deposit payment before manufacture, and 70% balanced payment against B/L Copy. Or L/C.

 

 

Send Inquiry