Steel Formwork is composed of aluminum alloy frames and wood plywood, and is matched with various conventional formwork accessories and aluminum frame connectors to complete concrete pouring projects for structures such as walls, columns or floor slabs. The durability of aluminum frame materials, when combined with different qualities of wood plywood (such as birch plywood, poplar plywood, eucalyptus plywood or mixed wood plywood, etc.), can meet the concrete pouring requirements of various building structures.
Send Inquiry
Description
Technical Parameters

Introduction

 

Q700 steel formwork is made from high-strength alloy steel for casting walls, columns, slabs, beams, and other structural concrete. The Q700 designation tells you the steel grade – minimum yield and tensile strength of 700 MPa.

The panels are 1.5mm thick, formed by stamping and laser welding. They come with a zinc-aluminum-magnesium (Zn-Al-Mg) coating that stops rust. Panel depth is 65mm. The modular design lets you set up different shapes without much fuss.

This system sits between traditional steel and aluminium. It performs like aluminium but costs about a third as much, and it is light enough that you do not need a crane for most handling. With 300+ reuses, the numbers work out well for repetitive floor construction.

 

Advantages

 

 

Weight

Panels weigh 19.6 to 24.7kg per square metre, depending on the configuration. Single panels run from 10kg up to 58kg. Most are manageable by two workers – no crane needed for routine handling.

 
 

Cost

Material cost is roughly one-third of aluminium. With 300-plus reuses, the cost per pour is lower than timber and aluminium over the project life. The Zn-Al-Mg coating outlasts conventional galvanised steel by two to three times.

 
 

Corrosion resistance

The Zn-Al-Mg coating, about 80μm thick, stands up to moisture, rain, and concrete slurry. It works in coastal areas, humid conditions, and outdoor storage – places where ordinary steel would rust quickly.

 
 

Reuse cycles

You get 300-plus uses with normal site care. Some operations report up to 1,000 cycles. Spread the cost over that many pours and it becomes hard to beat.

 

 

Concrete finish

The 1.5mm steel face gives you smooth, clean concrete. Often good enough to leave bare – no plastering needed.

01

Turnaround

Columns and shear walls come off the form in 24 hours. Slabs take 36 hours. Floor cycles run 4 to 5 days – comparable to aluminium.

02

Compatibility

Works with Ring Lock, Crab (500X), Kwikstage, and independent prop systems. Also connects with aluminium formwork panels.

03

Shipping

Flat-pack design cuts shipping volume by up to 60% compared to traditional steel formwork. That saves real money on international freight.

04

Recyclability

Steel is 100% recyclable when you are done with it.

05

 

Features

 

Property Specification
Material Q700 high-strength alloy steel
Yield/tensile strength ≥700 MPa
Panel thickness 1.5 mm
Frame depth 65 mm
Panel weight 19.6–24.7 kg/m²
Standard sizes 400×2700 mm, 400×2600 mm, 300×2700 mm, 350×2700 mm, 250×2700 mm, and smaller sizes
Load capacity ≥60 kN/m²
Coating Zn-Al-Mg, ~80 μm
Reuse cycles 300+ times
Demoulding time 24 h (columns/walls), 36 h (slabs)
Floor cycle 4–5 days
Compatible with Ring Lock, Crab (500X), Kwikstage, independent props

 

Specifications

 

 

 

Parameter

Specification

Material

Q700 high-strength alloy steel

Yield/Tensile Strength

≥700 MPa

Panel Thickness

1.5mm

Panel Frame Depth

65mm

Panel Weight

19.6–24.7 kg/m²

Standard Panel Sizes

400×2700mm, 400×2600mm, 300×2700mm, 350×2700mm, 250×2700mm, and smaller

Load Capacity

≥60 kN/m²

Reuse Cycles

300+ times

Surface Coating

Zn-Al-Mg (~80μm)

Demoulding Time

24h (columns/walls); 36h (slabs)

Floor Cycle

4–5 days

Concrete Finish

Bare concrete quality

Compatibility

Ring Lock, Crab (500X), Kwikstage, independent props

 

Custom sizes on request.

 

Applied Range

 

Q700 steel formwork covers most concrete work:

·High-rise residential and commercial towers

·Standard floor and repetitive slab work

·Super high-rise – works with Ring Lock, Crab, and Kwikstage shoring

·Industrial plants and factories

·Bridges and tunnels – coating handles wet and outdoor conditions

·Public infrastructure – airports, stations, hospitals, stadiums

·Basements and non-standard floors – including pipe galleries

·Complex shapes – round, curved, and irregular forms

Good for jobs where aluminium is too expensive but you still want light handling and quality concrete finish.

 

Component

 

A complete Q700 steel formwork system includes:

 

Panels

Connections

Reinforcement

Supports

Accessories

Standard wall and slab panels – various sizes

Corner sections – internal and external

Filler panels – for adjustment

Quick-connection system – panel-to-panel

Tie rods and nuts – through-wall tensioning

Flat ties – panel tensioning

Alignment couplers – panel alignment

Walers – horizontal bracing

Corner braces – stability

Modular waler system – Q700 steel

Adjustable steel props – vertical support

Pull-push props – plumb adjustment

Base jacks – levelling

Drop heads – early striking

PVC sleeves – tie rod extraction

Working platforms – access

Lifting hooks – crane handling

Corner fillers and transition pieces

 

Competitive Edge

 

01.

Cost

About one-third the price of aluminium. 300-plus reuses. Zn-Al-Mg coating lasts two to three times longer than conventional galvanised steel. Fewer replacements.

02.

Weight

19.6–24.7kg/m² – similar to aluminium. Handled by workers, not cranes. Saves on transport too.

03.

Rust protection

Zn-Al-Mg coating holds up in coastal areas, wet conditions, and outdoor storage. No rust issues.

04.

Speed

24-36 hour demoulding. 4-5 day floor cycles. Matches aluminium on turnaround.

05.

Finish quality

Smooth, clean concrete. Often bare concrete standard – no plastering.

06.

Flexibility

65mm depth, modular design. Walls, columns, slabs, beams. Custom sizes available.

07.

Freight

Flat-pack design cuts shipping volume by up to 60%. Real savings on international shipping.

08.

Track record

Used on large projects worldwide. Mature, field-proven.

 

Services

.jpg

Design consultation: free layout planning from your drawings

Custom fabrication: non-standard sizes and special configurations available

Technical support: video consultation within 24 hours; on-site for complex projects

Delivery: standard panels in 15-20 working days; custom orders 20-30 working days

Samples: available for testing – freight to be covered by buyer

 

 

FAQ

 

Q: What does Q700 mean?

A: It is the steel grade – yield and tensile strength of at least 700 MPa.

Q: How much load can it handle?

A: Over 60 kN/m² concrete pressure. Fine for high-rise and heavy-load work.

Q: How many uses can I get?

A: 300-plus with normal care. Some users report up to 1,000 cycles.

Q: How heavy is it?

A: 19.6–24.7kg per square metre. Single panels from 10kg to 58kg. Two workers handle most pieces.

Q: How does it compare to aluminium?

A: Costs about one-third of aluminium. Similar weight and performance. Same demoulding times and concrete finish.

Q: Does it rust?

A: No. The Zn-Al-Mg coating resists moisture – lasts two to three times longer than conventional galvanised steel.

Q: Can it work with aluminium formwork?

A: Yes. Q700 panels connect with aluminium systems.

Q: What sizes are available?

A: Standard sizes: 400×2700mm, 400×2600mm, 300×2700mm, 350×2700mm, 250×2700mm, and smaller. Custom on request.

Q: How soon can I strip it?

A: 24 hours for columns and walls. 36 hours for slabs.

Q: Do I need special tools?

A: No. Quick-connection system – no special tools needed.

Q: Can I get custom sizes?

A: Yes – non-standard sizes and special configurations available.

Q: How are panels shipped?

A: Flat-pack design – shipping volume cut by up to 60%. Saves on international freight.

 

 

 